The cap is simple to state. For the goods listed at your survey, your final invoice cannot be more than 5% above the quote in your bond. Anything beyond that is waived in full.
What makes it useful is everything around that sentence: what counts toward the 5%, what sits outside it, and how it plays out on a real move. This guide covers all three.
Why a Cap at All
Most people have heard a version of this story. The quote was ₹18,000. On the day, with the truck half-loaded, the figure became ₹26,000, for reasons that were hard to argue with at that moment: more cartons than expected, the stairs, the long walk to the truck.
A quote with no limit on how far it can move is not really a price. Our guide on why phone quotes change explains how that happens. It is an opening offer. The cap turns the quote into a number you can plan around.
Why 5% and Not Zero
A survey is thorough, but it is not perfect. A surveyor sees every room, but they do not empty every drawer. A carton or two can appear on the day that nobody opened during the visit. A society can move the loading point further from the tower than it was at the survey.
A promise of zero change would be a promise we could not keep honestly. The 5% absorbs the small, genuine differences that happen on real moves, and says plainly that anything beyond them is ours to absorb, not yours.
What Counts Toward the Cap
These are differences on the goods and the move that were surveyed:
- Extra volume found on the day that was in your home at the time of the survey
- Small access changes at a building, such as a slightly longer carry to the truck
- Additional packing material needed for items that were on the survey list
All of these count toward the 5%. If together they push the invoice past it, the excess is waived.
What Sits Outside It
Some changes are not part of the cap, because they were not there to be counted:
- Items you add after the survey, such as furniture bought later or goods from another home
- Services you ask for later, such as storage, extra dismantling, or a car added to the move
- A change of address or date that changes the distance or the work
These are quoted as separate lines and agreed with you before they are packed or carried out. They never arrive as a surprise at the truck door.
Charges That Depend on Your Building
Some costs belong to the buildings, not to the move: an entry fee charged by an office park, a society’s lift charge, or a permit. Where these are known at the survey, they go in the quote. Where a building introduces them after the survey, they are passed on at actual cost, with the receipt.
How It Plays Out
Take a surveyed quote of ₹20,000 for a 2 BHK.
The most you pay for the surveyed inventory is ₹21,000. Anything you add is priced openly, before it moves.
Where the Cap Is Written
The cap is written into the Written Commitment Bond, which both sides sign before any packing begins. The bond carries your quote reference, so the figure it protects is the one in your written quote, not a number someone remembers from a call.
How to Get the Most from It
- Show the surveyor everything, including the loft, the store room and the balcony. The more accurate the survey, the less the day can change.
- Mention the building: the floor, the lift, the parking and any society rules.
- Tell us about later additions early, so they are quoted before moving day.
- Keep your written quote and check the invoice against it.
The cap exists because the survey comes first. Book a free survey and you get the quote, and the cap, in writing. For typical figures, see packers and movers charges in India, and for how the cap sits with our other commitments, Why Us. When a mover has actually looked, it can afford to put a limit in writing.


