Planning

House Shifting Checklist: Four Weeks to Moving Day

A week-by-week plan from the first survey to the final handover, so nothing is left for the morning the crew arrives.

Published
3 March 2026
Reading Time
2 min read

Most moving-day problems are decisions that were left too late. Spread them across four weeks and the day itself becomes routine.

Four weeks out

  • Book the survey and get a written quote
  • Check your new building’s rules on moving hours
  • Decide what is not coming with you

Three weeks out

  • Sign the bond and fix the delivery window
  • Start the society gate pass and no-dues clearance
  • Book a service lift slot at both buildings

Two weeks out

  • Arrange utility cut-off and connection dates
  • Update your address with banks and employers
  • Set aside cash, jewellery and documents to carry yourself

The last week

  • Confirm the crew arrival time and loading point
  • Empty and defrost the fridge a day ahead
  • Keep one bag of essentials for the first night

On the day

Walk the inventory sheet with the crew before anything leaves, and walk it again at delivery. That sheet is what any damage or loss claim is checked against.

Get a Quote

Tell us where you are moving from and to. A surveyor from the nearest branch calls to book a visit, and the figure comes after that, in writing.

                We use your number to arrange the survey and nothing else. No marketing calls.

                Cookie Preferences
                • EssentialRequired

                  Cloudflare Turnstile

                • Analytics

                  Google Analytics · Google Tag Manager

                • Advertising

                  Google Ads · Meta Pixel